Lenel Lnl-3300-m5 Installation Manual Upd Instant

Connect the 12-24 VDC power lines to the designated power input terminal block. Double-check polarity (+ and -) before activating power.

Step 3: Wiring and ConnectionsReconnect the legacy wiring to the appropriate ports on the M5 controller.

Up to 650,000 cardholders (depending on configuration and event log allocation). Communication Ports: Port 1: 10/105Base-T Ethernet RJ-45 port.

: Remove the legacy CASI M5/M3000 CPU (models E, P, PX, PXN, or PXNplus) and the legacy Power/Comm Board (PN: 110064001). Lenel Lnl-3300-m5 Installation Manual UPD

Port 2 connects to the existing legacy M5 reader interface panels using the original 2-wire RS-485 bus cabling.

Used to set hardware operational modes and configuration overrides.

Lenel restricts direct PDF downloads behind a partner portal (LenelS2 Partner Network). However, legitimate integrators and end-users with a maintenance contract can access it via: Connect the 12-24 VDC power lines to the

This guide is for informational purposes. Always follow the official LenelS2 installation manual for compliance with local building codes and生命安全 regulations.

Connect the low battery/AC fail outputs from the enclosure power supply to monitor system health within OnGuard. 4. OnGuard Software Commissioning

Turning this switch ON during a power cycle performs a factory reset, wiping all downloaded databases and event logs. 3. Hardware Wiring and Connections Up to 650,000 cardholders (depending on configuration and

Disclaimer: Always refer to the official Lenel installation manual for your specific hardware revision. This post summarizes changes but does not replace manufacturer documentation.

The controller serves as the access control engine for the Lenel OnGuard system, making real‑time decisions and executing schedules locally even if host communication is temporarily lost. It supports a maximum of 32 board addresses and can manage up to 64 downstream devices (such as LNL‑1100, LNL‑1200, LNL‑1300, and LNL‑1320 modules) via its two RS‑485 ports.

| Feature | Specification / Capability | |:--------|:--------------------------| | | 15 MB total memory; firmware stored in flash memory with background download support | | Local Database | Up to 240,000 badge records; up to 256 access levels per badge | | Host Communication | Onboard 10/100 MB Ethernet (static IP or DHCP) | | Downstream Communication | 2‑wire RS‑485 via backplane; external 2‑wire RS‑485 port | | Power Input | 12 VDC ±10% @ 300 mA (supplied via legacy backplane) | | Physical Environment | Operating temperature: 32°F to 158°F (0°C to 70°C); humidity: 5–95% RHNC | | Security | AES 128‑bit encryption for reader/IO modules; AES256 or TLS1.1 to host | | Compliance | UL 294, RoHS |

Power down the existing legacy controller. Label all existing wires before disconnecting them to ensure they are returned to the correct terminals on the new LNL-3300-M5. Remove the old hardware from the M5 enclosure. Step 2: Mounting the LNL-3300-M5

En haut