User Manual Work =link= - Leica Tcr805 Total Station

: Verify the red laser dot matches the ground point exactly. Slide the instrument across the tripod head to adjust if necessary, then re-verify level. 3. Job Creation and Station Orientation

In the age of robotic total stations and GPS rovers, the Leica TCR805 remains a workhorse in the construction and surveying industries. Known for its rugged durability, reflectorless measurement (hence the "R" in TCR), and reliable angle accuracy, this instrument is still widely used for topographic surveys, construction layout, and monitoring projects.

Adjust the tripod legs to shift the laser dot directly onto the ground point. 3. Precision Leveling

After powering on the instrument, press the key from the surveying menu. Here, you can either "Select a Point" from the coordinate file or manually enter the coordinates of your survey station (X, Y, Z). leica tcr805 total station user manual work

or output via a serial interface (RS-232) to an external recorder or PC for post-processing. Carlson Software Key Programs & Applications

Sight a stable, well-defined point roughly 100 meters away in Face 1 (telescope upright). Press .

, and a balance of precision and ease of use that makes it a "workhorse" for on-site tasks. Core Specifications 5-second angular accuracy and distance precision of in fine mode. : Verify the red laser dot matches the ground point exactly

: 5 arc-seconds, ideal for standard construction layout and topographic mapping.

, which automatically corrects leveling inaccuracies, ensuring precise vertical and horizontal angle measurements even on uneven terrain. Its key features include: 30x magnification for clear long-distance sighting. Internal memory capable of holding up to 18,000 points , reducing the need for external data loggers in the field. Versatility: Supports both prism and reflectorless (RL) modes

Press (F4). The TCR805 will display its calculated position alongside the statistical accuracy errors (Standard Deviation). If acceptable, press Set to store the station coordinates. Workflow B: Topographic Data Collection Access the Surveying application. Ensure your Station Setup is complete. Set your target Prism Height (hr) in the status bar. Sight the object or prism to be surveyed. Job Creation and Station Orientation In the age

: Activate the electronic level on the display. Use the three leveling footscrews to center the digital bubble until checkmarks appear, indicating the biaxial compensator has leveled the instrument. Arizona State University (ASU) 2. Software Configuration USER MANUAL

A survey is only as accurate as its station setup. Follow this strict sequence to eliminate centering errors.

: Charge GEB111 or GEB121 NiMH batteries fully before heading into the field. Cold weather reduces capacity.

Define a line and set out points relative to it.